Our office is on Edinger Avenue in Huntington Beach, and Edinger runs east under the 405 into Fountain Valley along the north side of Mile Square Park, about 4 miles, so a crew is on a Fountain Valley street in 15 minutes with the mixer behind it and no freeway in the route. Plans go to the City of Fountain Valley Building Division at City Hall on Slater Avenue, and a new approach at the curb or a cut in the public walk takes an encroachment permit from Public Works. We file both.
The city is a grid of 1960s tracts between the 405 and the Santa Ana River, and the lots run a little wider than the ones on our side of the freeway, which is why a mixer can usually back to the front of a Fountain Valley job where in Huntington Beach it often cannot. Green Valley, the planned community off Brookhurst with its greenbelts and its association, is the exception. The lots are smaller, the walks are shared, and the association sees a drawing before the city does.
Water is the other thing we plan for. The river runs down the east edge of the city behind a levee, and the streets closest to it, off Brookhurst and Talbert, sit lowest and hold water longest after a storm. We probe the ground on the visit, dig out anything soft, and lay a draining base under every slab there. The salt air that shapes our work at the beach reaches Fountain Valley weaker, so the steel is held at standard cover rather than the 3 inches we give it at the pier.