Our office is on Edinger Avenue in Huntington Beach, and the route to La Palma is Bolsa Chica Road north, which becomes Valley View Street and runs up through Westminster, Garden Grove and Cypress into La Palma, about 12 miles and half an hour with no freeway in it. Plans go to the Community Development Department at La Palma City Hall on Walker Street, and a patio cover is a structure, so it takes a building permit there and the footings are inspected before the pour. We file it.
The city is under 2 square miles of 1960s tracts between the 91 and Coyote Creek, and it was Dairyland before it was La Palma, so the ground under every lot is level pasture that was graded once and built on. The streets off Walker Street and Moody Street are the same plan, a single-story or two-story house with a short drive and a yard behind it, and because the whole city is small the drive from any job to the counter on Walker Street is a few minutes.
The creek is the west edge of the city and the county line, and the ground beside it holds water into spring, so a base of crushed rock goes under every slab here and a floor goes over a vapor barrier. The jacaranda and the camphor on the older streets drop leaves and roots alike, which is why we plan a walk around the trees and seal a patio against the stain. The crew groups La Palma with Cypress, Buena Park and Cerritos, so a visit here is rarely a trip on its own.