Our office is on Edinger Avenue beside the 405, and the Westminster line is the freeway itself. A crew takes Beach Boulevard or Goldenwest Street across it and is on a Westminster street in 10 minutes, so this is the town we pour in most after our own. Permits are issued by the City of Westminster Building Division at City Hall on Westminster Boulevard, and anything at the curb goes through Public Works as an encroachment permit. Both are ours to file, and we meet the inspector.
The tracts between Bolsa Avenue and the freeway are the ones we know from the inside, because the same builders laid out the streets around our office. The lots are small and the houses single story, so the pour is a drive at the front or a patio at the back, and the concrete comes in by barrow through a side gate of 36 inches or less. Along Bolsa Avenue through Little Saigon the work turns commercial, shared parking and delivery aprons poured 6 inches thick for the trucks.
The water is what a Westminster estimate is written around. The city is flat and low, it drains through the flood channels to the Bolsa Chica, and in the west end the water table sits close under the yards, so a base here is built to drain and not only to carry. We dig to firm ground, lay crushed rock that water passes through, and set every form with a fall toward the street or a yard drain. A winter pour waits for a dry day and a dry night after it.